Blowdown

Engineering/Technical

The controlled release of boiler water to remove accumulated sludge, scale precursors, and dissolved solids that concentrate during operation and would otherwise cause corrosion and scale build-up inside the boiler. Bottom blowdown purges settled sludge from the lowest points and is done periodically at reduced load, while surface blowdown continuously removes dissolved solids from the water surface at the normal operating level.

Want to master maritime engineering?

RankUP Marine is built for marine engineers, from Engine Cadet to Chief Engineer.

Start Learning