The most stringent EEDI reduction phase, applying to ships contracted for construction on or after 1 April 2022 for most ship types, requiring a 30% reduction below the reference line. Phase 3 effectively necessitates step-change efficiency improvements or alternative fuels for many vessel categories, and IMO has indicated that future revisions may consider further strengthening the standard in line with revised GHG strategy mid-century ambitions.
EEDI Phase 3
EnvironmentalWant to master maritime engineering?
RankUP Marine is built for marine engineers, from Engine Cadet to Chief Engineer.
Start Learning