The deliberate disconnection of selected electrical consumers from the busbars to reduce the total load on the generating plant to a level that can be reliably sustained by the currently on-line generators, preventing generator overload, frequency decline, and cascading trips that could lead to a blackout. Load shedding may be performed automatically by the power management system (preferential trip) or manually by the engineer on watch when the load approaches generator capacity; consumers shed are ranked by a load priority list so that safety-critical and operationally essential equipment is the last to be disconnected and the first to be restored when generating capacity increases.