A pre-arrival document prepared by the ship or terminal that depicts the arrangement of mooring lines — number, size, material, lead angle, and connection points on both the ship and the berth — required to safely secure the vessel alongside a specific berth for the expected environmental conditions and cargo operations. Mooring plans for exposed terminals and large vessels must comply with OCIMF Mooring Equipment Guidelines criteria for line loads, angle limits, and safe working load margins.
Mooring Plan
Deck/NavigationWant to master maritime engineering?
RankUP Marine is built for marine engineers, from Engine Cadet to Chief Engineer.
Start Learning