The level of risk remaining after all planned control measures have been applied. Residual risk must be assessed as acceptable by the authorising officer before a permit to work is issued; if residual risk remains unacceptably high, additional controls must be identified or the task must not proceed.
Residual Risk
Safety/EmergencyWant to master maritime engineering?
RankUP Marine is built for marine engineers, from Engine Cadet to Chief Engineer.
Start Learning